Plans: 1. Install lower instrument panel. Status: Started. Cutouts for the four gauges were made and the wood veneer stained. I elected to hinge the lower edge as recommended by Hymer. I have about half of the gauges. Switch and circuit breaker cutouts will be added as needed. 2. Install upper instrument panel. Status: Started. It is being temporarily held in place for the photos. I have a strip of nut plates fabricated for the back side lower edge. I would like the top and bottom panels to meet in the middle with a close fit.