Brief Description: Left & Right Lower Wing Covering
Plans: 1. Cover the right lower wing. Status: About 20% complete. Fabric has been applied to the lower surface and shrunk to 250 degrees. 2. Cover the left lower wing. Status: About 25% complete. Fabric for the top surface was glued to the leading edge. It will be pulled and adhered to the rear and side edges next session. The tie-down bolt required a hole to pass through the fabric into the frame. The location was reinforced with a small circle of fabric.