Plans: 1. Remove the lower wings in readiness for covering. Status: Complete. The wings have been removed and the leading edges have been taped down for covering. 2. Fab the root fairing for the lower left wing. Status: 90% complete. The remaining left faring was fabbed. I still need to add some plate nuts and hose clamps and then attach them to the wings. Hopefully it will go fairly quickly.