Powered By Kitlog Pro v2.0
Chris' Web Site
Fokker D.VII
Wings
9-24-2020
< Previous Log Entry
Next Log Entry >
Date:
9-24-2020
Number of Hours:
5.00
Manual Reference:
Brief Description:
Upper Left Wing Fabric
Plans:
1: Cover the bottom surface.
Status: Complete. The lower surface was covered and pre-shrunk to 250 degrees. The experience doing the previous wing is helping. The quality is noticably better.
Interior Upper Left Wing Tip
Bottom Surface Upper Left Wing Root
Bottom Surface Upper Left Wing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fokker D.VII Home
Category
# Logs
# Hours
All
578
2401
Avionics
25
112
Cockpit Interior
39
172
Empennage
31
166
Engine
64
232
Fuselage
166
720
Landing Gear
34
148
Miscellaneous
19
20
None
6
4
Propulsion
11
20
Tools
6
9
Wings
177
798
Copyright © 2001-2024 Matronics. All Rights Reserved.