Powered By Kitlog Pro v2.0
Chris' Web Site
Fokker D.VII
Wings
7-24-2020
< Previous Log Entry
Next Log Entry >
Date:
7-24-2020
Number of Hours:
5.50
Manual Reference:
Brief Description:
Right Aileron
Plans:
1. Cover the right aileron.
Status: 50% complete. It was a nice break having a small piece to cover. The fabric has been applied and shrunk at 250 degrees. I still need to add surface and perimeter tapes.
Right Aileron Bottom
Right Aileron Top
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fokker D.VII Home
Category
# Logs
# Hours
All
578
2401
Avionics
25
112
Cockpit Interior
39
172
Empennage
31
166
Engine
64
232
Fuselage
166
720
Landing Gear
34
148
Miscellaneous
19
20
None
6
4
Propulsion
11
20
Tools
6
9
Wings
177
798
Copyright © 2001-2024 Matronics. All Rights Reserved.