Plans:Plans: 1. Add N strut passages to the lower wing. Status: 100% Complete. The passages for the left side are installed. 2. Reinstall the left N strut. Status: Complete. 3. Add the remaining portion of the L.E. sheeting to the left lower wing. Status: Complete.