Plans: 1. Add N strut passages to the lower wing. Status: 50% Complete. The lower wing passages for the N struts have been cut out. Three of the four are installed. The blank covers for the passages are complete. 2. Reinstall the right N strut. Status: Complete. 3. Add the remaining portion of the L.E. sheeting to the left lower wing. Status: 25% complete. The sheet is prepared for installation.