Plans: 1. Complete the aileron build. Status: Complete. The ribs were added to the outermost sections. The control horns were added. And the hinges were tweaked a bit for better alignment. 2. Install aileron controls. Status: About 10% complete. The Teleflex style cables have been temporarily installed to verify alignments and placement. This turned out to be a bit tricky. The cables need to be secured such that the throw in both directions is even at each aileron. Lots of trial and error was involved but it appears I found a sweet spot. A permanent solution will be devised during the next session.