Plans: 1. Continue construction on upper wing airfoils. Status: The remaining ribs for the upper wing are cut to fit. A total of 29 upper top and 29 bottom ribs. This was a little monotonous given the large number of ribs. Next up will be the gussets that attach them to the spars.