KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  2-9-2019
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Rigging

Plans:
1. Continue wing rigging.
Status: 50% complete. All four landing wires were installed. One of the four lift wires were installed. As a follow-up to the remark about insufficient cable length. After rigging the landing wires with 1/8" cable I have about four feet left over. The cabanes would have required about 8 feet to rig. While I did scrap some cable during the landing wire fabrication it appears that at best there was exactly enough cable supplied. That said it is pretty difficult to build the rigs without wasting some cable. So I would strongly recommend improving the kit with about two more feet of cable.
' style=

Right Lift Turnbuckle

Right Lift Turnbuckle

' style=

Right Landing Turnbuckles

Right Landing Turnbuckles

' style=

Right Wing Rigging

Right Wing Rigging

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.