Plans: 1. "N" strut installation. Now that the strut members have been cut to length and coped, the gussets are being tailored and matched drilled. Status: 50% complete: The left "N" strut has been temporally drilled and installed. The right strut was started. After both are completed some touch up paint is required then the final rivets. The structure is getting pretty rigid. I have developed a slight out-of-level condition on the left rear spar. I’m going to leave it as-is. I suspect once things are rigged the error will be lost in the mix.