Plans: 1. Reinstall the Cabanes after painting. Status: 90% Complete. I reinstalled all the cabanes with clecos. I will permanently rivet them next session. 2. Start "N" strut installation. Status: Started. I was able to get one of the six strut sections coped and temporarily placed. The remaining five will likely go more quickly. Before the install I had to re-level the entire structure to minimize as much error as possible. I also used a strip of black electrical tape to help locate and size the segments uniformly in the structure.