KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  1-5-2019
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Cabanes

Plans:
1. Continue the cabane installation.
Status: At the end of the last session I discovered after bolting the cabanes in some of the alignment was slightly lost. Today I spent the time tweaking the cabanes back to level. This was not too difficult as all the holes had been drilled 1/8" as opposed to 3/16" in anticipation of an issue. After correcting the pieces I was able to remove the scaffolding in the mid-section. Everything was still dead on. At the moment I am happy with the result. I am going to have to delay moving on to the "N" struts as I am out of clecoes. The cabanes need paint and rivets first.
' style=

Side View

Side View

' style=

Front View

Front View

' style=

Fear View

Fear View

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.