Brief Description: Fuselage Windows and Tail Cover
Plans: 1. Close up the remaining opening in the fuselage. Status: 90% complete. The two windows on the bottom surface of the fuselage have been installed. The top surface of the tale is now closed. I need to add some surface tapes to tidy things up then some matching paint.