Plans: 1. Install the lead bars. Status: Complete. All three bars are installed. The nose cowling has also been reinstalled. A new watch item will be the back side of the propeller. The propeller bolts come fairly close to the cowl now. These bolts are slightly longer than the home brew bolts I replaced.