Powered By Kitlog Pro v2.0
Chris' Web Site
Fokker D.VII
Fuselage
2-15-2021
< Previous Log Entry
Next Log Entry >
Date:
2-15-2021
Number of Hours:
5.00
Manual Reference:
Brief Description:
Fuselage Fabric
Plans:
1. Cover the fuselage.
Status: 90% complete. Surface tapes have been applied to the bottom side. The perimeter tapes for the seams on the top side and tail post were added. Inspection/access rings have been installed on both sides.
Bottom Side Surface Tapes
Rear of Cockpit Tapes
Left Side Inspection Rings
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fokker D.VII Home
Category
# Logs
# Hours
All
532
2302
Avionics
25
112
Cockpit Interior
35
159
Empennage
31
166
Engine
40
166
Fuselage
165
718
Landing Gear
32
140
Miscellaneous
12
16
None
6
4
Propulsion
6
20
Tools
5
7
Wings
175
794
Copyright © 2001-2021 Matronics. All Rights Reserved.