Powered By Kitlog Pro v2.0
Chris' Web Site
Fokker D.VII
Fuselage
2-12-2021
< Previous Log Entry
Next Log Entry >
Date:
2-12-2021
Number of Hours:
4.00
Manual Reference:
Brief Description:
Fuselage Fabric
Plans:
1. Cover the fuselage.
Status: 60% complete. The top side fabric is on and preliminarily shrunk to 120 C. The GPS and Grip cutouts are Included.
Fuselage Fabric Top Side
Grip Cutout in Fabric
Top Side Fabric at Cockpit Front
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fokker D.VII Home
Category
# Logs
# Hours
All
578
2401
Avionics
25
112
Cockpit Interior
39
172
Empennage
31
166
Engine
64
232
Fuselage
166
720
Landing Gear
34
148
Miscellaneous
19
20
None
6
4
Propulsion
11
20
Tools
6
9
Wings
177
798
Copyright © 2001-2024 Matronics. All Rights Reserved.