Plans: 1. Install the cockpit coaming. Status: 70% Complete. I continued to install the foundation for the coaming. The front of the cockpit was trimmed with PEX tubing. The tubing was secured in place temporarily with zip ties. Shoe glue was injected into the gaps to secure the tubes permanently. Foam pipe insulation was glued with contact cement to the side rails.