KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  10-9-2018
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Inspection Hatch

Plans:
1. Complete brake installation:
Status: Complete. I finished up the installation by creating two set screws to clamp the brake cables.
2. Fabricate and install inspection hatchs into the right and left fuselage panels.
Status: 80% complete. Adding hatches to the panels requires several new parts to be fabbed. I was able to get the parts cut out and some assembly done today. The panel openings were cut. Doors were cut out as well as backing plates for the doors and hinges. Next session I will be adding latches to the doors and finishing the assembly.
' style=

Access Door Cutout

Access Door Cutout

' style=

Access Door

Access Door

' style=

Access Door Components

Access Door Components

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.