Plans: 1. Install fuel tank. Status: Cut and padded two support ribs for the tank. Still no power at the shop. I spent some time getting a small portable generator going (800 W). Basically enough for small hand tools. So I was limited to a hacksaw and sander for now. I only completed the support ribs before moving on to the lift handles. 2. Install lift handles. Status: Complete. I was able to cut and shape the components for the handles. Eventually power was back on in the shop. So I was able to rivet the parts in place. 3. Fix the stirrup bracket. Status: Complete. Only a couple of details but I decided to create a new bracket on the far side. It was a little too small.