KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  5-27-2020
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Empennage Perimeter Tapes

Plans:
1. Add perimeter tapes to the empennage.
Status: 15% complete. Covering of the vertical stabilizer is complete. The rudder is partially complete. The horizontal stabilizer is waiting its turn.
Note, I decided to add some additional surface tapes to the rudder and elevator to improve the finished appearance. So these tapes will need time to dry before adding more perimeter tapes.

I spent quite a bit of time cleaning excess cement from the vertical stabilizer. While adding the perimeter tapes I had wiped excess cement toward the pinked edge rather than down the length. I thought it would give a cleaner pinked edge. It did except it also created a mess of cement to clean off the part. I also found that a lot of glue is being wasted by trying to apply a generously wet coat to bed into. I am finding that a little less works as well and saves both on product and clean-up.
' style=

Rudder Surface Tapes

Rudder Surface Tapes

' style=

Rudder L. E. Perimeter Tapes

Rudder L. E. Perimeter Tapes

' style=

Vertical Stabilizer Perimeter Tapes

Vertical Stabilizer Perimeter Tapes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.