KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  10-14-2017
Number of Hours:  5.00
Manual Reference:  E16, F3
Brief Description:  Horizontal Stabilizer

Plans:
1. Install horizontal stabilizer to fuselage.
Status: Complete.

2. Add remaining fuselage ribs.
Status: 80% Complete. Unfortunately I ran out of rivets and could not install all the ribs. I was however able to cut and cope the majority of the ribs and drill the holes. When Fastenal opens during the week I can buy some more. I do have 3/16" rivets so I can start the landing gear in the meantime.

Fastenal Rivet Part Numbers:

41125 Are the 3/16" rivets
41103. Are the 1/8" rivets
' style=

H.S. Mounted with Standoffs

H.S. Mounted with Standoffs

' style=

Bottom Fuselage Ribs

Bottom Fuselage Ribs

' style=

Interior Ribs Installed

Interior Ribs Installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.