Powered By Kitlog Pro v2.0
Chris' Web Site
Fokker D.VII
Tools
4-29-2017
< Previous Log Entry
Next Log Entry >
Date:
4-29-2017
Number of Hours:
0.00
Manual Reference:
Brief Description:
Install Lighting
Plan:
1. Add hanger lighting.
Status: Complete. Assembled and erected 2 hanger overhead lights on EMT conduit into 4 cement footings. Bolted the conduit using simple sleve made from AS pipe. The setup is unstable and needs additional weight and bracing. Will finish next weekend.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fokker D.VII Home
Category
# Logs
# Hours
All
578
2401
Avionics
25
112
Cockpit Interior
39
172
Empennage
31
166
Engine
64
232
Fuselage
166
720
Landing Gear
34
148
Miscellaneous
19
20
None
6
4
Propulsion
11
20
Tools
6
9
Wings
177
798
Copyright © 2001-2024 Matronics. All Rights Reserved.