Plans: 1. Complete the boost battery wiring. Status: Complete. The final hook-up of the battery cables was completed. 2. Prime and paint the bottom surface. Status: Started. 3. Mate the wings to the fuselage. Status: 80% complete. The wings were reinstalled. It took the majority of the day, about 3 hours. Bolting the struts in place it difficult due to the bolts being recessed inside the wings.