KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  11-23-2020
Number of Hours:  20.00
Manual Reference:  
Brief Description:  Right & Left Upper Wing Paint

Plans:
1. Paint the upper wings.
Status: 50% complete. I have relocated my wings to my house to be painted. The hanger was a bit crowded and dusty. I have also neglected to log my efforts for the past week. So this entry includes several days’ work. At the moment I have painted the upper right wing top and bottom and the top side of the upper left wing. Five coats of primer on the top and three on the bottom. Two additional coats of Bay Mist on the bottom. I am saving the cross insignia on a white field for last.
' style=

Primed Upper Left Wing Root

Primed Upper Left Wing Root

' style=

Primed Upper Left Wingtip

Primed Upper Left Wingtip

' style=

Bottom Upper Right Wing

Bottom Upper Right Wing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.