Brief Description: Left & Right Lower Wing Root Fairing & Covering
Plans: 1. Continue covering the left lower wing. Status: 50% complete. A second coat of adhesive was applied to the felt overlayment. Cutouts for the N-strut covers were made. Holes for the rib rivets were drilled. 2. Cover the right lower wing. Status: Started. While the left wing was drying I decided to start the right wing. The faring was attached and root covering added.