Plans: 1. Cover the left aileron. Status: 50% complete. The fabric has been applied and shrunk at 250 degrees. I still need to add surface and perimeter tapes.
The fabric of the right aileron was re-shrunk at 300 degrees. No distoration in the structure was observed.