Powered By Kitlog Pro v2.0
Chris' Web Site
Fokker D.VII
All
6-10-2020
< Previous Log Entry
Next Log Entry >
Date:
6-10-2020
Number of Hours:
4.00
Manual Reference:
Brief Description:
Empennage Paint
Plans:
1. Paint the botton surface of the horizontal stabilizer and elevator.
Status: Complete. Three coats of Bay Mist were applied to the bottom surfaces of the horizontal stabilizer. The parts have been placed in position for installation.
Horizontal Stab Bottom Side
Elevator Botton Side
Placed Empennage Components
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fokker D.VII Home
Category
# Logs
# Hours
All
578
2401
Avionics
25
112
Cockpit Interior
39
172
Empennage
31
166
Engine
64
232
Fuselage
166
720
Landing Gear
34
148
Miscellaneous
19
20
None
6
4
Propulsion
11
20
Tools
6
9
Wings
177
798
Copyright © 2001-2024 Matronics. All Rights Reserved.