Plans: 1. Install the fuel pumps. Status: 50% Complete. Both pumps were installed into the mount without problems. Routing of the output lines is another story. My first attempt failed in that there was no way to pass the line through the firewall without an extremely tight radius. The possibility of kinking was high. I elected to reroute things a bit resulting in a clean penetration of the firewall. The new route presented some risk of abrasion of the line under vibration. I will mitigate that by encasing the risk area in a protective outer layer of garden hose that will be mounted to the frame. 2. Install the battery cables. Status: 50% Done. Installing the cables went smoothly. I found an area where the fuel pump mount came close to the +12 terminal block. I elected to make a relief cut in the mount to improve the clearance.