KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  10-11-2019
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Battery Box

Plans:
1. Install the battery box.
Status: 90% complete. The first attempt to mount the battery box had its own challenges. The fuselage structure needed to be reinforced behind the box to provide a mounting point. And the front of the box needed to be cut away to allow the battery to be easilly installed/removed.

Since the fuselage was built up already it took a bit to tailor the structure accept the box.
' style=

Battery Box Mount

Battery Box Mount

' style=

Battery Box Left

Battery Box Left

' style=

Battery Box Right

Battery Box Right

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.