Plans: 1. Assemble upper wing end ribs. Status: About 75% complete. Today was a repeat of yesterday's work. The difference being attention was on the right wing. Remaining work will be to add the stiffening supports for mounting them to the compression struts and lightening holes.
Following that will be building the inner airfoils and securing them to the spars. They were actually built awhile back as upper and lower ribs. The ribs will be joined into an airfoil shape with gussets.