KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  2-4-2019
Number of Hours:  4.50
Manual Reference:  
Brief Description:  "N" Struts

Plans:
1. Install "N" struts.
Status: I continued the "N" strut installation by painting the gussets and riveting them in their final location. At the moment about half of the gussets are permanently installed. The other half are still wet from painting.
2. Install side panels.
Status: 50%. The side panels were removed to provide access during cabane construction. Now that the cabanes are in place the panels have been notched where the cabanes pass. The top cover will need notches as well. I saved the top for the next session. The top has an added complexity in that rigging cables must pass through it.
' style=

Right Forward Cabane with Rivets

Right Forward Cabane with Rivets

' style=

Cabane Cutouts in Panel

Cabane Cutouts in Panel

' style=

Side View

Side View

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.