KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  1-29-2019
Number of Hours:  5.00
Manual Reference:  F23, F24, W48
Brief Description:  Cabanes & "N" Struts

Plans:
1. Reinstall the Cabanes after painting.
Status: 90% Complete. I reinstalled all the cabanes with clecos. I will permanently rivet them next session.
2. Start "N" strut installation.
Status: Started. I was able to get one of the six strut sections coped and temporarily placed. The remaining five will likely go more quickly. Before the install I had to re-level the entire structure to minimize as much error as possible. I also used a strip of black electrical tape to help locate and size the segments uniformly in the structure.
' style=

Reinstalled Cabanes

Reinstalled Cabanes

' style=



"N" Strut Top Coped

' style=



"N" Strut Bottom Coped

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.