KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  1-4-2019
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Cabanes

Plans:
1. Continue with cabane installation.
Status: All the cabanes have been cut and installed with clecoes. After doing so I rechecked levels and found two small issues. I have found that in drilling and securing the gussets to the compression struts with 1/4" bolts a slight error was induced. Since nothing is riveted at the moment I should be able to tweak it here and there to get things right. I will save that for the next session. Nothing is permanently installed at this time as I am getting ready to paint all the pieces before locking things down.
' style=

Top Right Rear Cabane

Top Right Rear Cabane

' style=

Top Left Rear Cabane

Top Left Rear Cabane

' style=

Lower Rear Cabanes

Lower Rear Cabanes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.