Plans: 1. Continue with cabane installation. Status: All the cabanes have been cut and installed with clecoes. After doing so I rechecked levels and found two small issues. I have found that in drilling and securing the gussets to the compression struts with 1/4" bolts a slight error was induced. Since nothing is riveted at the moment I should be able to tweak it here and there to get things right. I will save that for the next session. Nothing is permanently installed at this time as I am getting ready to paint all the pieces before locking things down.