KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  12-31-2018
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Wing Scaffolding

Plans:
1. Continue scaffolding construction and level wings.
Status: About 50% done. The scaffolding has been set up with the wing frames attached. The lower wings have been leveled in place. The upper wings have been notionally leveled. The final upper wing elevation is yet to be set exactly. I spent most of the time today checking alignments. While things are level front to back and side to side there is some skew in the placement. It is proving difficult to find a sweet spot where everything is perfect. All the dimensions are as they should be yet the "N" struts appear slightly off front to back. It may just be a matter of bolting things down as you go to force alignments. We shall see. Overall it looks acceptable.
' style=

Scaffolding

Scaffolding

' style=

Plumb Bob

Plumb Bob

' style=

Left Structure

Left Structure

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.