Plans: 1. Continue storage bin fab and install. Status: 90% complete. The enclosure was riveted in place and secured to the aircraft. I also added a frame to stiffen and trim the front of the bin. It could still use some added support at the top. I will be doing that next..
Note: A cargo net and internal retainer have been temporarily installed. I have some felt on order to use as a bottom liner. I need to wait on the liner before installing these final components.