KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  8-21-2018
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Instrument Panel

Plans:
1. Continue I/P installation.
Status: Completed the installation of hard points and the preliminary mounting. I am still short some of the engine gauges.
2. Fab nut plate strips.
Status: Ongoing fabrication. These strips will be used to mount the front side and top fairings. Lots of nut plates to go.

On a side note I lofted the rear of the aircraft to level it on the front wheels. I am getting ready to fab and install the top center wing. The entire aircraft will need to be rigidly held in place to keep everything level.
' style=

Panel Front

Panel Front

' style=

Tippy Toes

Tippy Toes

' style=

Plate Nut Strips in Work

Plate Nut Strips in Work

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.