KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  7-2-2018
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Lift Handles

Plans:
1. Install fuel tank.
Status: Cut and padded two support ribs for the tank. Still no power at the shop. I spent some time getting a small portable generator going (800 W). Basically enough for small hand tools. So I was limited to a hacksaw and sander for now. I only completed the support ribs before moving on to the lift handles.
2. Install lift handles.
Status: Complete. I was able to cut and shape the components for the handles. Eventually power was back on in the shop. So I was able to rivet the parts in place.
3. Fix the stirrup bracket.
Status: Complete. Only a couple of details but I decided to create a new bracket on the far side. It was a little too small.
' style=

Mounting Brackets

Mounting Brackets

' style=

Lift Handles

Lift Handles

' style=

Stirrup

Stirrup

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.