KitLog pro

Powered By Kitlog Pro v2.0

Chris' Web Site
' style=
Date:  5-5-2018
Number of Hours:  5.00
Manual Reference:  W1, W2
Brief Description:  Carry Through

Plans: Install Carry Throughs.
Status: 80% complete. Today was a big day. I drilled the holes in the fuselage for the carry throughs and installed them. In old builds the wings were built with a 2.5 degree positive incidence. This is reported to have resulted in excessive climb. The AA fix was to adjust the wing to one degree and horizontal stab to positive two degrees. If the holes are placed correctly I will have the planned performance. If wrong. It may be difficult to control. Mis-drilling these holes could result and a major do-over. I tried very hard to do this right but won't know until it flies.

I also started the bellcrank installation. Using the bc will allow me to lower the seat a bit. Once I get the seat installed I can place the rudder pedals and brakes to fit my body.
' style=

Bellcrank

Bellcrank

' style=

Rear Carry Through

Rear Carry Through

' style=

Carry Throughs Installed

Carry Throughs Installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.