Plans: Install Joystick & Floorboard. Status: Complete. I put the joystick together today and mated it to the elevator pushrod. It works! The elevator moved with the stick. I did see what others noted. The pushrod tube flexes a lot. That is why the bellcrank was made earlier. I still need to have the parts welded. After that I will have the finished system.