Plans: Install brakes to landing gear. Status: Second wheel brake installed and wheel mounted. I also installed the gear and took some pictures. You can see that I removed the cross bracing cables installed last week. I have elected to install 3/16 cables versus the 1/8 cables. This is to accommodate the heavier engine I am planning. The cable material is on order now.