KitLog pro

Powered By Kitlog Pro v2.0

Chrigels RV8 Kit Log
' style=
Date:  9-27-2016
Number of Hours:  6.00
Manual Reference:  6-10
Brief Description:  Finished left elevator and trim tab

With the help of my two friends, I was able to finish the trim tab mounting and finished riveting the left elevator.

The hinge pin is running smooth all the way in.

Beside th elec trim installation rod installation and the fiberglass work, everything is done. All the sheet metal work finished of my first empennage project!

I am proud of me. It took 180 hrs and 6 month to complete the empennage.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.