Brief Description: Finished left elevator and trim tab
With the help of my two friends, I was able to finish the trim tab mounting and finished riveting the left elevator.
The hinge pin is running smooth all the way in.
Beside th elec trim installation rod installation and the fiberglass work, everything is done. All the sheet metal work finished of my first empennage project!
I am proud of me. It took 180 hrs and 6 month to complete the empennage.