KitLog pro

Powered By Kitlog Pro v2.0

Chrigels RV8 Kit Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  1-28-2016
Number of Hours:  5.50
Manual Reference:  
Brief Description:  First Time working in the shop - Toolbox Project

Today I used for the first time the tools I bought a couple month ago.
I started with the toolbox project from Vans.

The deburing, drilling and dimpling was fine.

I had my problems with the riveting...since the toolbox can not be attached properly it moved out of position during riveting. I had 3-4 rivets which were not nice.
There was also not enough space to keep the flush rivet set in proper position. So I had to rivet on the edge of the flush rivet set and the rubber protector made it almost impossible to have a proper alignement.

I will try to do it better on the next practice project.

Finally I assembled the toolbox!
' style=

Deburing all parts

Deburing all parts

' style=

Dimpling with the squeezer

Dimpling with the squeezer

' style=

Finished my first project

Finished my first project

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.