KitLog pro

Powered By Kitlog Pro v2.0

Chrigels RV8 Kit Log
' style=
Date:  5-24-2016
Number of Hours:  3.25
Manual Reference:  6-6
Brief Description:  1st Rivet

Work on the Vertical Stabilizer. I riveted the rear spar initially with the pneumatic squeezer for the AN470 D4-6. All rivets were a bit too long when measured with the rivet gage -4. Therefor I was absolutely not happy with the first results. I had to remove all rivets again (12 pieces).
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.