KitLog pro

Powered By Kitlog Pro v2.0

Jim's Web Site
' style=
Date:  5-23-2020
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Flyled Fabrication

Purchased the Flyled NAV/STROBE kit from Flyboys. Great fabrication instructions and easy to work with.
' style=

Started with the installation of LEDs on the boards after trimming

Started with the installation of LEDs on the boards after trimming

' style=

Installed heat sinks and wire ribon

Installed heat sinks and wire ribon

' style=

Fabricated Control board which will be mounted under passenger seat

Fabricated Control board which will be mounted under passenger seat

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.