Powered By Kitlog Pro v2.0
Jim's Web Site
RV-7
All
5-23-2020
< Previous Log Entry
Next Log Entry >
Date:
5-23-2020
Number of Hours:
9.00
Manual Reference:
Brief Description:
Flyled Fabrication
Purchased the Flyled NAV/STROBE kit from Flyboys. Great fabrication instructions and easy to work with.
Started with the installation of LEDs on the boards after trimming
Installed heat sinks and wire ribon
Fabricated Control board which will be mounted under passenger seat
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
94
1111
Avionics
17
363
Canopy
3
42
Canopy
5
64
Controls
6
21
Empennage
14
76
Engine
9
52
Firewall
3
23
Fuselage
13
82
Landing Gear/Brakes
1
3
Lighting
1
9
Lighting
1
5
None
2
1
Panel
17
363
Wings
1
2
Wiring
1
5
Copyright © 2001-2024 Matronics. All Rights Reserved.