We selected a L and R nose rib that was trimmed on the forward and aft. We dimpled the rivet holes indicated on the instructions. We attached the nut plates on both L & R nose rib. We attached the Doubler plates to each selected nose rib.
We dimpled, deburred and attached 2 nut plates to one of the three remaining untrimmed Right and Left nose ribs. ---- Nick fluted and straightened all of the W-1210 main Ribs (both left and right). Amber trimmed the forward flange off of all 13 Ribs (both left and right). ---- Right rib: clecoed the W-1210B-R (doubler) and match drilled #30 the main rib using the doubler as a guide. Left rib: clecoed the W-1210B-L (doubler) and match drilled #30 to the main rib using the doubler as a guide. All holes were deburred and the doublers were primed. ---- Hinge Bracket Assemblies were clecoed to the main rib (both left and right) and match drilled #30 and then deburred all holes and the hinge brackets were set aside. ---- We clecoed the rib doublers back onto the main ribs (both left and right) and riveted the doubler plates to the main ribs (both left and right).
Nick's hours: 9hrs 30min Amber's hours: 30min Total combined for 7/17/2022: 10hrs