With close attention to detail in the instructions, we selected each specific Nose Rib as discribed in the build instructions and clecoed, then riveted each Nose Rib to the wing spar.
Nick dimpled the 12 most forward holes on the 2nd and 3rd Nose Rib (counting from the inside) for the wing walk.
We attached the Left Stub Spar Assembly with clecos and then riveted it to the Nose Ribs. We inserted the snap bushings into the nose ribs (this will be for wires).
Nick's hours: 2 Amber's hours: 2 Total combined for 7/20/2022: 4