KitLog pro

Powered By Kitlog Pro v2.0

CMBAero
' style=
Date:  3-31-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Rivet Rear H. Stab Spar

Both half of the rear horizontal stabilizer spar were joined together with the doubler and rivteted in place... Also, all elevator attachment brackets were riveted in place!
Elevator control bearing was final drilled in place with a #12 high speed reamer!
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.