KitLog pro

Powered By Kitlog Pro v2.0

CMBAero
' style=
Date:  3-23-2012
Number of Hours:  1.50
Manual Reference:  C.M. 6-2
Brief Description:  H. Stab Ribs Riveting...

I clecoed and riveted the two right side ribs to the main front spar... I also deburred, dimpled and primed the left side ribs...
The right h. stab skin was installed in the jig and the two front nose ribs were clecoed, I also riveted the one on the end with the squeezer...
' style=

Ribs riveted to front spar..

Ribs riveted to front spar..

' style=

Skin reinstalled in the jig ready for final assembly!

Skin reinstalled in the jig ready for final assembly!

' style=

Nose rib riveted...

Nose rib riveted...

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.